Project Details

Design and Concept

In designing a facility to address the health, wellness, and recreational needs of CSUDH students, this 4 story, 83,000 square foot center would house the following elements:

  • Two basketball courts/volleyball courts and one multi-activity court for free play and competition
  • A rock-climbing wall
  • Cardio workout equipment, including treadmills, elliptical machines, stair climbing machines, and stationary bicycles
  • A jogging track elevated above the courts on the bottom floor
  • Free weights
  • Dance studio rooms with mirrored walls to host yoga, cheer, aerobics, and dance practices for student club performers
  • Gender-inclusive locker rooms and changing facilities, complete with showers
  • Office spaces for the director, staff, and student interns

Integrated Centers and Services

The facility would also house:

  • A satellite psychological services and mental health center
  • A satellite Student Health Center with numerous medical specialties
  • A healthy eating and nutritional counseling center, complete with a video-capable demonstration kitchen
  • A stress reduction and relaxation room

Budget for the Project

When equipment, operational costs, and engineering systems are factored into the construction costs, the expected facility cost is $85 million.

Financing the Project

We are proposing a model of funding that includes various segments of the external and internal campus community. These include:

  • One-time capital funding from the State of California for a down payment of $20,000,000
  • Philanthropic contributions from various foundations
  • A student referendum to support construction and operational costs